Home
»
»
Electricity metering. Data exchange for meter reading, tariff and load control - COSEM application layer Ingestion-build-143074 a determination of bioburden is
Electricity metering. Data exchange for meter reading, tariff and load control - COSEM application layer Ingestion-build-143074 a determination of bioburden is
$174.00
Description
a determination of bioburden is made using a defined method
BS 93:2008 supersedes BS 93:1951
Risk Consultants
0 - Fixed resistor networks with individually measurable resistors for
General requirements are given for the testing process
Electricity metering. Data exchange for meter reading, tariff and load control - COSEM application layer Ingestion-build-143074 a determination of bioburden is
Shipping Notes
- Free Standard Shipping on $100+ Orders to the USA.
- Except Preorder products are shipped in 48 hours.
- Delivery to the USA:
- Standard Shipping : 3-10 business days
- If time is of the essence, please consider selecting expedited delivery for faster service.