Electronic fee collection. Requirements for urban dedicated short-range communication Ingestion-build-109673 the smart city concept model
$153.00
Description
the smart city concept model (SCCM) (see ISO 30182) and the data framework used for sharing data and information services (see PAS 183)
shop primers
Pressurization principle
have not been covered in BS EN 16890:2017 and therefore BS 1877-10:2011 + A1:2012 can still be used to assess these products
and the need to incorporate automatic changeover devices
Electronic fee collection. Requirements for urban dedicated short-range communication Ingestion-build-109673 the smart city concept model1 Scope This technical report analyses DSRC Urban Charge Point Requirements including the following issues: The core requirements and functionality that must be provided within DSRC equipment in an urban context; The potential aesthetic impact; How to handle the different traffic conditions in urban areas; Accommodation of the diversity of road users; The potential need to address highly variable topology; A wide variety of installation challenges;
Shipping Notes
- Free Standard Shipping on $100+ Orders to the USA.
- Except Preorder products are shipped in 48 hours.
- Delivery to the USA:
- Standard Shipping : 3-10 business days
- If time is of the essence, please consider selecting expedited delivery for faster service.